Quality control of concreting in hot temperature
- Management of Materials
- Aggregates shall be stock-piled in shade.
- Regular sprinkling of water to aggregate.
- Arrangement for circulation of cold air in aggregates.
- Using cold water (up to 5oC)
- Low heat cement can be used.
- Retarding admixtures are also helpful in delaying the setting process.
- Management of Concreting Work:
- Scheduling the concreting work in evening (but with sufficient lighting)
- Use of more masons for quickly finishing the work.
- Transporting the concrete in deep containers.
- Covering of concrete with moist materials as early as possible.
- Curing of Concrete:
- The concrete shall be cured with cold water.
- The surface shall be continuously made wet either by ponding, or using water absorbing materials in surface like cloth, jute, sand, etc.
- If possible, shade shall be maintained on the concrete.